Founded in: 1985
Managing director: Dheeraj Garg
Steel Strips Wheels (SSWL), a part of the multifaceted Steel Strips Group, has the accumulated experience of the group behind it. The other companies of the Group are Steel Strips (the flagship company of the Group), Steel Strips Tubes, S A Builders and Indian Acrylics. The Company is a leading manufacturer of Automotive Wheel rims.SSWL started commercial production from 1991. The company is armed with the latest knowhow, manufacturing automobile wheel rims (cap. : 1.8 mln) at its stateoftheart manufacturing unit at Chandigarh. The company introduced for the first time in the country Cathodic Electro Deposition to its product range. Its surface coating plant has been supplied, erected and commissioned by a leading company from the US. The Rim Line unit has been supplied by Hess Engineering, US, and the paint shop has been supplied by George Koch Sons, US.SSWLs main clients are Maruti Udyog (MUL), Mahindra Mahindra, Bajaj Tempo, etc. The company is striving to achieve the ISO 9000 certification.The commercial production of new wheels for Honda Siel Car was started in the year 199798.The technical collaboration with Ring Tech Co Ltd was for a period of 3 years.The modernization cum expansion programme to enhance the installed capacity which was started in the year 199899 is at the completing stage and programme is likely to be completed in September 2001.In the year 19992000, the company has tied up technology with Japanese technical consultants relating to process and product quality control, reduce rejection substantially from the present level, upgrade product quality assurance systems, impart advance training in wheel and die design and technical assistance to staff for procurment of equipments.During year 200304, the Company designed and developed wheels for new models of Cars, MUVs, Scooters and Tractors including, INDIGO/ROVER, 207DI, WAGON RVXI, MODELE, GALAXY, TRACTOR FRONT WHEEL and TRACTOR REAR WHEEL. It also commenced mass production of wheels like BOLERO/SCORPIO, CAMPER/SAVARI, SINGLE CAB, HONDALQ. The Company commenced mass production of Marutis ModelK (swift) wheel in FY 200405. It completed its modernization cum expansion plan to increase its installed capacity to 7.5 Million Wheels per annum including for LCV Wheels during FY 200607. It set up a new plant for manufacturing wheel rims for passenger cars and MUVs at Oragadam near Chennai in Tamil Nadu with installed capacity of 3 million in FY 200708. It commenced commercial production at Oragadam plant (near Chennai) Tamil Nadu with installed capacity of 2.50 million Wheel Rims in FY 200809. The Companys new Truck Wheel Rims Facility at Jamshedpur commenced its commercial production during the year 201011. The Company added additional capacity at its Dappar plant. With this, the total installed capacity results enhanced from 7.50 million wheel Rims to 9.00 million wheel rims p.a. during FY 201011. The Second phase expansion at the Oragadam unit of the company was completed during the year 201112, which had started the commercial production. With this, the total installed manufacturing capacity of Oragadam unit of the Company increased from 2.5 million to 6 million wheel rims p.a. With the commissioning of Jamshedpur unit, setting up of additional line at Dappar and expansion of Oragadam unit of the company, the total installed capacity of the company has increased to 16 million wheel rims per annum during FY 201112. During the year 201516, the manufacturing capacity of Jamshedpur plant of the Company has enhanced from 1 million wheel rims to 1.60 million wheel rims p.a. The said additional capacity of 0.60 million commenced its Commercial Production w.e.f 1st October, 2015. As a result, the total installed capacity of the Company comprising of Jamshedpur, Dappar and Chennai Plant increased from 16 million to 16.60 million wheel rims p.a. The Company had also put up a hightech Steel Processing Unit named Ute Mayr Steel Service Centre at Dappar unit (Punjab) of the Company, for Steel Pickling, Slitting and Cut to Length with a monthly processing capacity of 20,000 Ton Steel. With the setting up of hightech Steel, the said Steel Processing Unit has commenced its commercial production w.e.f. 31st March, 2016.
Read More