Magna Electro Castings Share Price

BSE
MAGNAELQ •
BUY

1W Return

1M Return

6M Return

1Y Return

3Y Return

The current prices are delayed, login or Open Demat Account for live prices.
Start SIP in Magna Electro Castings
Stock Performance
52 Week Low - High
Today’s Low - High

Open

Prev. Close

Total Traded Value

View details of Market Depth
Fundamental

Market Cap (in crs)

Face Value

Turnover (in lacs)

Key Metrics
Qtr Change %
30.58% Fall from 52W High
-8.3
Dividend yield 1yr %
Below industry Median
0.6

Magna Electro Castings shareholding Pattern

Promoter
53.4%
Public
46.6%
Promoter
53.4%
Public
46.6%
Promoter
53.4%
Public
46.6%
Promoter
53.4%
Public
46.6%
Promoter
53.4%
Public
46.6%
Promoter
53.4%
Public
46.6%

Magna Electro Castings Technical Analysis

Moving Averages Analysis
Moving Averages Analysis
Current Price
Bullish Moving Averages
12
Bearish Moving Averages
4
5Day EMA
885.00
10Day EMA
869.60
12Day EMA
866.30
20Day EMA
863.90
26Day EMA
869.10
50Day EMA
898.00
100Day EMA
904.70
200Day EMA
830.40
5Day SMA
878.80
10Day SMA
859.50
20Day SMA
847.20
30Day SMA
836.20
50Day SMA
924.40
100Day SMA
978.20
150Day SMA
925.20
200Day SMA
821.70
Delivery & Volume

Delivery & Volume

PeriodCombined Delivery VolumeNSE+BSE Traded Volume
Day Rs
1206 Rs
1737 Rs
Week Rs
1333 Rs
1669 Rs
Month Rs
1318 Rs
1661 Rs
Resistance & Support
921.25
Pivot
Resistance
First Resistance
943.50
Second Resistance
985.25
Third Resistance
1,007.50
Support
First Support
879.50
Second support
857.25
Third Support
815.50
Relative Strength Index
54.33
Money Flow Index
64.74
MACD
-2.80
MACD Signal
-15.86
Average True Range
59.77
Average Directional Index
19.11
Rate of Change (21)
10.45
Rate of Change (125)
11.84

Magna Electro Castings Company background

Founded in: 1990
Managing director: N Krishna Samaraj
Magna Electro Castings Ltd was incorporated in 1990. The company was promoted and Managed by N Krishna Samaraj. The company is mainly engaged in manufacturing and selling of Cast Iron Components.In 2001 the company has successfully commissioned its state of the art CAD/CAM Centre for producing tooling.The Company had implemented a Energy Conservation Project in 200102 at a cost of Rs.110 lakhs and was funded by internal accruals and term loans from Corporation Bank. In the area of raw material recycling and production automation the company is planning to make investments to the tune of Rs.150 lakhs and will be financed by means of Internal accruals and Term Loans. This project was put on hold due to decision on implementation of the latest technology and processes.The Company commissioned the Gas project costing Rs 0.41 Crores during 2004. In 2005, it commissioned the Furan Fast Loop Line and the Sand Mixer plants costing Rs 3.78 Crores. It installed one 750 kw Wind Electric Generator costing Rs 3.06 Cr. at Andhiyur Village in Pollachi Taluk. It commissioned one 1650 kw Wind Electric Generator in Ganapathipalayam village, Pollachi Taluk costing Rs 9.70 Crores during August 2005.The e Phase I Expansion Project costing Rs 8.14 Crores for construction of buildings was completed and the required plant and machinery was commissioned during 2007. The Company implemented the Phase I of the expansion project, thereby increasing the capacity from 600 MT to 900 MT per month in 2008.During 2009, the Company commissioned the Sand PreProcessing Plant. During 201112, it installed/commissioned the Automatic Grinding cell which was imported from Italy for fettling operations. It also commissioned the additional factory building measuring about 30,000 Sq.Ft. which will accommodate the machining activities of the Company.In 201213, it commissioned the new Hunter Molding Machine. It augmented Diesel Power Generating capacity, with the installation of two 1500 KVA generators. Capable of parallel operation through an automatically computer controlled synchronized panel, the sets can provide 3000 KVA power.During 201415, it installed new Energy efficient Melting Induction Furnace, replacing the old and worn out furnaces and in 201516, further installed the Furan Thermal Reclamation Sand Plant costing Rs 2 Crores for reclamation of sand and also installed the Furan No Bake Continuous Mixer for achieving consistency in casting dimension and 3D Printing Technology for shorter development time and reduction in sampling time.During 201617, it installed the Furan core preheating oven in its production line costing Rs 0.11 Crores. The Core Shop was upgraded during 201718 utilizing lndustry 4.0 Techinques and enabled process. The Sample coin conveying system was commissioned during 201819. The Company installed Green Sand Reclamation Plant during 202021. It further installed a new Fume Extraction System in the furnaces which will enable the Company to use alternative raw materials at a lower cost as well as keeping the environment free of pollution. It also installed certain balancing equipments to enhance the manufacturing capabilities.During 202122, it installed new 1 Ton Capacity induction melting furnace to enhance its existing furnace capacity. During 202223, it installed some balancing equipments/machinery which will enhance the production activities of the Company. Civil works were undertaken to increase the floor space of the finishing division and machine shop. Roads were also laid/ relaid to facilitate easy of movement of vehicles inside the Plant.
Read More

Magna Electro Castings FAQs

You can easily buy Magna Electro Castings shares in Kotak Securities by opening a demat account and getting the KYC documents verified online.

Please be aware that Magna Electro Castings stock prices are subject to continuous fluctuations due to various factors.

Open Demat Account
+91 -

personImage
Open Demat Account
+91 -