Diamond Power Infrastructure Share Price

BSE
DIACABS •
BUY

1W Return

1M Return

6M Return

1Y Return

3Y Return

The current prices are delayed, login or Open Demat Account for live prices.
Start SIP in Diamond Power Infrastructure Ltd
Stock Performance
52 Week Low - High
Today’s Low - High

Open

Prev. Close

Total Traded Value

View details of Market Depth
Fundamental

Market Cap (in crs)

Face Value

Turnover (in lacs)

Key Metrics
Qtr Change %
913.09% Gain from 52W Low
10
TTM PE Ratio
High in industry
261
Price to Book Ratio
Negative Price to Book
-8
Dividend yield 1yr %
0
TTM PEG Ratio
PEG TTM is slightly more than 1
1.1

Diamond Power Infrastructure Ltd Key Financials

View more

*All values are in ₹ Cr.

*All values are in ₹ Cr.

*All values are in ₹ Cr.

*All values are in ₹ Cr.

Diamond Power Infrastructure Ltd Quarterly Revenue

Sep 2024Jun 2024Mar 2024Jun 2023Dec 2017
250.3 Cr
223.86 Cr
134.41 Cr
74.45 Cr
105.03 Cr

Diamond Power Infrastructure Ltd Yearly Revenue

Mar 2024Mar 2017Mar 2016Mar 2015Mar 2014
344.12 Cr
1142.42 Cr
2249.49 Cr
2850.09 Cr
3185.34 Cr

Diamond Power Infrastructure Ltd Quarterly Net Profit/Loss

Sep 2024Jun 2024Mar 2024Jun 2023Dec 2017
4 Cr
16.56 Cr
14.42 Cr
5.52 Cr
-29.71 Cr

Diamond Power Infrastructure Ltd Yearly Net Profit/Loss

Mar 2024Mar 2017Mar 2016Mar 2015Mar 2014
17.02 Cr
-794.7 Cr
-271.11 Cr
-184.43 Cr
110.03 Cr

Diamond Power Infrastructure Ltd shareholding Pattern

Promoter
90.6%
Public
9.4%
Promoter
90.6%
Foreign Institutions
0.1%
Public
9.3%
Promoter
94.9%
Public
5.1%
Promoter
11.4%
Foreign Institutions
0.8%
Domestic Institutions
57.9%
Public
29.9%
Promoter
11.4%
Foreign Institutions
0.8%
Domestic Institutions
66.7%
Public
21.1%
Promoter
11.4%
Foreign Institutions
0.8%
Domestic Institutions
66.7%
Public
21.1%

Diamond Power Infrastructure Ltd Technical Analysis

Moving Averages Analysis
Moving Averages Analysis
Current Price
Bullish Moving Averages
4
Bearish Moving Averages
12
5Day EMA
158.20
10Day EMA
160.30
12Day EMA
160.50
20Day EMA
160.10
26Day EMA
159.60
50Day EMA
156.80
100Day EMA
146.50
200Day EMA
120.40
5Day SMA
159.80
10Day SMA
162.00
20Day SMA
159.40
30Day SMA
157.80
50Day SMA
160.30
100Day SMA
152.50
150Day SMA
138.70
200Day SMA
118.40
Delivery & Volume

Delivery & Volume

PeriodCombined Delivery VolumeNSE+BSE Traded Volume
Day Rs
95133 Rs
95133 Rs
Week Rs
100930 Rs
100930 Rs
Month Rs
154799 Rs
154799 Rs
Resistance & Support
154.43
Pivot
Resistance
First Resistance
157.27
Second Resistance
162.08
Third Resistance
164.92
Support
First Support
149.62
Second support
146.78
Third Support
141.97
Relative Strength Index
44.22
Money Flow Index
46.51
MACD
0.85
MACD Signal
1.99
Average True Range
8.64
Average Directional Index
17.62
Rate of Change (21)
1.67
Rate of Change (125)
30.38

Diamond Power Infrastructure Ltd Company background

Founded in: 1992
Diamond Power Infrastructure Limited is an integrated solutions provider in Power TD space in India. Primarily established as a conductor manufacturer in 1970 by Mr. S N Bhatnagar, a first generation technocrat and presently the Chairman of the Company, Diamond Power achieved greater integration post completion of is expansion projects during 201011. The company provides turnkey services in TD, manufactures Power Cables upto 550KV, Power Distribution Transformers upto 220KV, Transimission and Distribution Conductors upto 765KV and Transmission Towers. Today, it commands presence across the value chain conductors, cables (LT, HT EHV), transformers (power and distribution), transmission towers and EPC services. With 9 manufacturing locations and headquarter, all located in Vadodara, Gujarat the Company also has more than 100 distributors across 16 Indian states.The companys businesses include cables and conductors, transformers and EPC projects. Their product portfolio includes power and control cables, specialty cables, transmission and distribution conductors, and power and distribution transformers. They are having a subsidiary, namely Diamond Power Transformers Ltd.The company cables are sold under the brand name DICABS and they are preferred by a spectrum of utilities like Refineries, Cement Plants, Power Plants, Engineering Industries, Pharmaceutical units among several others and are also sold through a large dealer network. Diamond Power Infrastructure Ltd was incorporated in the year 1992. In the year 1994, the company set up a small LT power cables manufacturing facility at Vadadala, Gujarat, in a bid to extend their Conductors Business. During the year 19992000, the company commenced commercial production of their backward integration cum expansion unit at Vadadala, Salvi, Gujarat to manufacture Aluminium and Alloy Wire rods. Also, they commenced production at their Silvassa plant.During the year 200405, the company increased the production capacity of Aluminum Alloy ACSR Conductors by 18350 MTPA to 45000 MTPA. During the year 200506, they further increased the production capacity of Aluminum Alloy ACSR Conductors by 5500 MTPA to 50500 MTPA.During the year, the company launched their power business in collaboration outsourcing with two key facilities in Himachal Pradesh and Rajasthan. The company launched an entire range of House Wires, Multicore Flexibles, Panel Wires, CAT Cables and various types of Security Cables. In August 2006, the company ventures in EPC Contracts (Turnkey Contracts) under Government of India sponsored RGGVY to reach free electricity to the people below poverty line. In March 2007, the company acquired Western Transformers and in July 2007, they acquired Apex Electricals Ltd, which had the combined capacity of 15,000 MVA.During the year 200809, the company undertook EHV Cables, LT Cables and Transmission Line Project. In July 2008, the company commenced commercial production of HT Cables upto 132 KVA with a capacity of 2800 km with all imported plants from the Germany. The company has expanded HT cables line of 2500 km line along with an LT cables of over 25000 km, which is about to start production. They are also putting up plant to manufacture Extra High Voltage Plant 132 KVAs to 400 KVAs with an installed capacity of 2000 km per annum. The company has also planned to put a plant for manufacture of Extra High Voltage Cables 132 KVAs to 400 KVAs. Also, they further propose to putup a Greenfield product for manufacture of Transmission Towers and expand the present capacity of LT cables. The new facilities are proposed to be created at the existing site located at Village Vadadala, Taluka Savli, Vadodara.The Company in 201011 commenced operations in Extra High Voltage (EHV) cables and power transformer units commenced power transformer operations and in Oct 10, got into strategic JVs with Utkal Galvanizers, Skoda India and Schaltech Automation to increase their footprints in 220 KV and above EPC Projects.During March 2012, the Company invested Rs. 50 crore to commission its 6.3 MW windmills, purchased from Suzlon Energy, at Jamanwada, Kutch. In November 2012, it commissioned Ultra High Voltage Cable Testing Laboratory having a capability to 500 KV capacity in Vadodara. It embarked on Rs. 753 crore expansion programme for MV cables and conductors and acquired strategic stake in Maktel. In February 2014, it commissioned the Phase I of capacity expansion for 3000 kms in Medium Voltage (MV) cables and 50,000 MTPA in conductors businesses.
Read More

Diamond Power Infrastructure Ltd FAQs

The past 1-year return of Diamond Power Infrastructure Ltd [DIACABS] share was 932.28. The Diamond Power Infrastructure Ltd [DIACABS] share hit a 1-year low of Rs. 13.97 and a 1-year high of Rs. 193.58.

You can easily buy Diamond Power Infrastructure Ltd shares in Kotak Securities by opening a demat account and getting the KYC documents verified online.

Open Demat Account
+91 -

personImage
Open Demat Account
+91 -